Project Overview: The project is located in Mianyang City.
It is equipped with a 2.5MW/5.24MWh energy storage system. It provides power guarantee for Sheraton Hotel during peak hours, reduces the hotel’s electricity costs through peak load shaving and load demand tracking services.