Project Overview: The project is located in Cheng-Mian Expressway.
It is equipped with a 0.5MW/1.164MWh energy storage system, which increases the transformer capacity of the service area. At the same time, it combines photovoltaic power generation to provide power guarantee for the charging piles in the service area. By shaving peaks and filling valleys and tracking load demand, the electricity cost of the service area is reduced.
https://honda-fit.ru/forums/index.php?autocom=gallery&req=si&img=7038